CfD Contract Portfolio Status

This dataset includes each CfD Contract, its Maximum Contract Capacity and latest status of each project.

Status of each CfD project is determined based on the notices issued by LCCC when different milestones get past. Start date is the best estimate date on which the generator will start generating.

This dataset is updated monthly.

Data and Resources

Additional Info

Field Value
Source
Version
Author
Author Email
Maintainer
Maintainer Email
Shared (this field will be removed in the future) Open
IB1 Sensitivity Class
IB1 Trust Framework
IB1 Dataset Assurance
IB1 Trust Framework
Allocation round Different CfD Allocation round
CfD ID ID which identifies each CfD generator
Estimated Start Date Estimated date on which the generator will start generating
Maximum Contract Capacity (MW) Generators submit an Initial Installed Capacity Estimate (IICE) at the time of application. The IICE is used as a reference point throughout the CfD. For a successful generator, Installed Capacity can only ever be altered lower than the IICE. The IICE can be adjusted downwards by up to 25% by the Milestone Delivery Date
Name of CfD Unit Name of a CfD Unit
Status Different stages of CfD contracts. E.g: Pre-Start Date, Post-Start Date,Terminated
Technology Type Technologies of CfD generators
Transmission or Distribution connection Connection type of the transmission or distribution network
harvest_object_id 46dbb309-a40d-46df-91c3-2a75f23af56e
harvest_source_id aaa12101-7c68-4568-8e34-76ffda599c76
harvest_source_title LCCC Data Portal