Commercial-Scale Front-End Engineering Design Study for Membrane Technology and Research’s Membrane Carbon Dioxide Capture Process

Membrane Technology and Research, Inc. (MTR) is conducting a front-end engineering design (FEED) study for an ~400-megawatt-electric (MWe) membrane carbon dioxide (CO2) capture system installed at Basin Electric’s Dry Fork Station in Gillette, Wyoming. The project builds on prior work in advancing MTR’s membrane capture technology through small pilot testing and a pre-FEED study.

Data and Resources

Additional Info

Field Value
Source
Version
Author
Author Email
Maintainer
Maintainer Email
Shared (this field will be removed in the future) Open
IB1 Sensitivity Class
IB1 Trust Framework
IB1 Dataset Assurance
IB1 Trust Framework
citation Andrew Jones, Commercial-Scale Front-End Engineering Design Study for Membrane Technology and Research’s Membrane Carbon Dioxide Capture Process, 6/7/2022, https://edx.netl.doe.gov/dataset/commercial-scale-front-end-engineering-design-study-for-membrane-technology-and-research
fgdc_compliancy
geospatial no
netl_product yes
poc_email [email protected]
point_of_contact Andrew Jones
program_or_project Carbon Capture
project_number FE0031846