Super Stable Export Limit Contract Enactment

Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of generators synchronized to the system by lowering the minimum generating level at a generator synchronised. The service is open to Balancing Mechanism participants who can meet the minimum technical requirement. Super SEL service does not require a change in the energy output of the generation, it is to give access to a reduced minimum active power level. Super SEL contract enactment will be through a trading instruction. Dispatch will be via the Balancing Mechanism to reduce output to the new lower SEL if required. Live data is refreshed every 10 minutes, and if there are no changes to the data, then there will be no updates.

Data and Resources

Additional Info

Field Value
Source National Grid Electricity System Operator
Version
Author
Author Email
Maintainer
Maintainer Email
Shared (this field will be removed in the future) Open
IB1 Sensitivity Class
IB1 Trust Framework
IB1 Dataset Assurance
IB1 Trust Framework
Status Live
harvest_object_id 20102597-7130-49fd-b1e3-63c92b6bd468
harvest_source_id 916f7f66-3a3b-43e9-afc0-85d31134d7b3
harvest_source_title National Grid ESO