Advanced Sorbent Structure Recovery of Rare Earths, Precious Metals and Other Critical Materials from Geothermal Waters and Its Associated Technoeconomics

The work evaluates, develops and demonstrates flexible, scalable mineral extraction technology for geothermal brines based upon solid phase sorbent materials with a specific focus upon rare earth elements (REEs). The selected organic and inorganic sorbent materials (silica and MOF) demonstrated high performance for collection of trace REEs, precious and valuable metals beyond commercially available sorbents. This report details the silica and MOF sorbent uptake, percent removal, and distribution coefficient results for Nd, Eu, Dy, Y and Ce, as well as the characterization of these select sorbent materials.

The report also contains estimated costs from an in-depth technoeconomic analysis of a scaled up separation process. The estimated financial payback period for installing this equipment varies between 3.3 to 5.7 years depending on the brine flow rate of the geothermal resource.

Data and Resources

Additional Info

Field Value
Source https://gdr.openei.org/submissions/850
Version
Author
Author Email
Maintainer
Maintainer Email
Shared (this field will be removed in the future) Open
IB1 Sensitivity Class
IB1 Trust Framework
IB1 Dataset Assurance
IB1 Trust Framework
GUID https://data.openei.org/submissions/3551
Language
dcat_issued 2016-09-21T06:00:00Z
dcat_modified 2018-02-27T01:00:30Z
dcat_publisher_name Pacific Northwest National Laboratory
ib1_trust_framework []