Common Information Model West Midlands

Common Information Model (CIM) for 132kV, 66kV, 33kV, and 11kV in the West Midlands generated by the NGED Integrated Network Model (INM). For each Grid Supply Point (GSP) there exists an Equipment Profile (EQ) and Geographic Location profile (GL), and two Diagram Layout profile files (one for 132kV and one for 33kV). The EQ describes the equipment in the power system model, and the GL profile is a geographical data instance file which contains GIS data, and the DL profiles provide schematic layouts at different voltages.

Data and Resources

Additional Info

Field Value
Source National Grid Electricity Distribution
Version
Author
Author Email
Maintainer
Maintainer Email
Shared (this field will be removed in the future) Open
IB1 Sensitivity Class
IB1 Trust Framework
IB1 Dataset Assurance
IB1 Trust Framework
Subject Common Information Model
Type Systems & Solutions
harvest_object_id bf7b740b-f738-4c16-b19e-91c5d00e46cf
harvest_source_id 6d6f03c5-5b06-48d3-8afd-ec9498dc17da
harvest_source_title National Grid DNO