Indicator Landslides: MPI-M-MPI-ESM-LR_rcp45_r1i1p1_SMHI-RCA4_v1a_1981-2100

In addition to bias-corrected climate scenarios, a number of climate indicators have been developed in the CLIMAPROOF project. They represent critical events for infrastructure and were designed together with experts from the relevant fields such as road infrastructure or hydrology.

Landslides

Annual sum of days exceeding either 1-, 2-, or 3-day precipitation sum thresholds calculated after Moser and Hohensinn (1983). DOI: https://doi.org/10.1016/0013-7952(83)90003-0

Period

1981-2100

Scenario

RCP4.5

Data and Resources

Additional Info

Field Value
Source
Version
Author Benedikt Becsi
Author Email Benedikt Becsi
Maintainer Benedikt Becsi
Maintainer Email Benedikt Becsi
Shared (this field will be removed in the future) Open
IB1 Sensitivity Class
IB1 Trust Framework
IB1 Dataset Assurance
IB1 Trust Framework
harvest_object_id 36db0a38-6a60-4184-86f5-6262e465f006
harvest_source_id 39bb87e5-d63e-483d-a85a-62f6a1675bc4
harvest_source_title CCCA Data Server