PRIMRE Signature Project Page for Reference Model 2
URL: https://tethys-engineering.pnnl.gov/signature-projects/rm2-river-current-turbine
Reference Model 2 Signature Project Page. Includes information about the RM2 including a technical drawing, additional information, and associated engineering documents.
There are no views created for this resource yet.
Additional Information
Field | Value |
---|---|
Data last updated | unknown |
Metadata last updated | June 27, 2023 |
Created | unknown |
Format | HTML |
License | No License Provided |
Created | 1 year ago |
Id | ff98d383-eb7d-4f52-94f4-c5e6361fb96a |
Package id | 05ac8e38-6c0c-4ad6-911d-64cb87e322bb |
State | active |