Potential Drawdown Scenario A Shapefile.zip
URL: https://gdr.openei.org/files/718/ModelAdrwdn.zip
This modelled scenario comprises two new supply wells, each pumping at 100 gpm. The maximum drawdown in is 87 feet at each well. Each contour line represents the amount of drawdown in feet, of the water table after 14 days of pumping. Modelling was done with AQTESOLVE software, adn used to calculate transmissivity. The model assumes homogenous aquifer conditions with transmissivity and vertical thickness equal to that of the aquifer test.
There are no views created for this resource yet.
Additional Information
Field | Value |
---|---|
Data last updated | unknown |
Metadata last updated | June 27, 2023 |
Created | unknown |
Format | ZIP |
License | No License Provided |
Created | 1 year ago |
Id | c6ddb0b9-b658-4c8b-a582-9fef69ff97cc |
Package id | 81e014e7-e639-40a3-8bae-434d3be008da |
Position | 4 |
State | active |