-
Common Information Model South Wales
Common Information Model (CIM) for 132kV , 66kV and 33kV in the South Wales generated by the WPD Integrated Network Model (INM). For each Grid Supply Point (GSP) there exisits... -
Common Information Model South West
Common Information Model (CIM) for 132kV , 66kV and 33kV in the South West generated by the WPD Integrated Network Model (INM). For each Grid Supply Point (GSP) there exisits a... -
Common Information Model West Midlands
Common Information Model (CIM) for 132kV , 66kV and 33kV in the West Midlands generated by the WPD Integrated Network Model (INM). For each Grid Supply Point (GSP) there... -
Electric Vehicle Capacity Map
One element of our plan to accommodate electric vehicles on our network is to make use of existing capacity. We have reviewed this capacity at a street by street level using our... -
Supergrid Transformer Access Period Connection Point Peak Demands for mainten...
Supergrid Transformer Access period (weeks 13 - 43) Peak Demands and forecasts during maintenance periods -
132kV PM Full WPD Area (4 DNOs) in ESRI ShapeFile (SHP) Format
Supplied chunked at OS 20km Grid (Assets Only). Contains WPD Assets at 132kV excludes ALL Low Voltage Network -
GSP Dummy
This dataset has no description